Save 15%

UPAKARMA Shilajit Resin With Safed Musli 20 G|300 Mg/Serving|For Men To Boost Physical Performance,Power,Stamina And Strength|100% Ayurvedic|Lab Tested|66 Servings|Pack Of 2,2 Count

NZD63.43
List price: NZD74.50
 15% Off
100 item(s)
+
  • Enhances Physical Performance - The remarkable blend of Safed Musli and Shilajit works together to help improve performance in a truly harmonious way. Safed Musli helps in achieving better physical results more energy and stamina. Shilajit helps in enhanc
  • Improves Vigor and Vitality - Safed Musli helps in stimulating t-level production and helps increase vigor. Shilajit helps in enhancing nutrient absorption revitalizing the body and strengthening overall physical well-being.
  • Reduces Stress & Anxiety - Discover the natural power of Pure Shilajit & Safed Musli in resin form to help reduce stress and anxiety. Safed Musli supports nervous system promoting a sense of calm and relaxation while Shilajit assists in uplifting your moo
  • Assured Quality - With Upakarma you get the best quality in the segment as all our products are 100% natural and go through 7+ levels of quality checks which are also AYUSH approved and manufactured in GMP & ISO certified units.
  • How To Use - Take a pea-sized amount of Upakarma Ayurveda Pure Shilajit Resin Form with Safed Musli and dissolve it in 100 - 200 ml of lukewarm milk or water. Stir it thoroughly and drink. For best results it is advisable to consume twice a day or as dire
Purchase Protection
Secure Payment
Easy Returns
Fast Delivery

Shipping Price - Flat 10NZD Charges or Get Free Shipping on order above 80NZD with minimum 3 Qty.

Upakarma Ayurveda is a brand that understands the daily struggle and imbalance of life and vows to restore balance and quality to life. Balance has long been acknowledged as the key to achieving wellness. At Upakarma we aim to discover and develop herbal ayurvedic formulations in the most natural ways to ensure a healthy, fruitful life.
Country of Origin:
India
darshanbhamani
Advantages
Nice product
Comment
Very nice
Shivam
Advantages
Price can be reduced with avilable quality & Taste
Comment
Taste normal but Price is high
Riyas
Advantages
An ancient Ayurvedic health tonic widely used as a rejuvenative, energiser and immunity booster. It is often called ‘the elixir of life’. This is the first historically documented formula from the ancient Ayurvedic treatise. Known to benefit the immune system and helps fight againt common cold and other respiratory infections.
Comment
Best product..
Amazon Customer
Advantages
Take it daily best in performance
Comment
Just wow
rohit tiwari
Advantages
Satisfactory
Comment
Satisfactory
Binu F.
Advantages
Excellent performance. Better than just the Shilajit,though both are very good in quality.
Comment
This is twice the effect literally!
Ashiyabanu kazi
Advantages
Product is well and good but seems to be over priced. I ordered it bcoz of offee only. Otherwise i would have gone with any other options
Comment
Well and good
Saanvi With Mamma
Disadvantages
Not a good product to be consumed. Sodium benzoate ? Why is it in an Ayurvedic product . I would definitely not recommend this product.
Comment
Not worth
Suraj
Advantages
Product is very nice in taste and flavour. Packing is also attractive.Delivery associate and time is quite satisfactory. I am very much satisfied with this product and it's delivery.
Comment
Upakarma is making a good effort to provide ayurvedic items at reasonable prices.
Balakrishnan
Advantages
Nice productBut expensive
Comment
Nice

Similar products